Foundationless Jib Crane Installation: 3 Cranes in About a Day

Three finished foundationless jib cranes in a steel grating manufacturing plant
Three finished foundationless jib cranes in a steel grating manufacturing plant

We recently installed three foundationless jib cranes for a customer that manufactures industrial steel grating. They needed a way to lift heavy steel grates and move them over to a conveyor system that will be installed along their production line. Because their existing concrete floor met the crane manufacturer’s requirements, we could skip cutting the slab and pouring new foundations, and the installation took about a day.

Here is how the project came together, what a foundationless jib crane is, and how to tell whether one could work in your facility.

Key takeaways

  • We installed three foundationless jib cranes for an industrial steel grating manufacturer, with no new concrete foundation poured.
  • Once the crane locations were finalized, our installation team installed all three cranes in about a day.
  • A foundationless jib crane anchors directly to an existing concrete floor, but only when that slab meets the crane manufacturer’s requirements.
  • With several cranes in one area, placement planning (reach, clearance and nearby equipment) mattered as much as lifting capacity.

Watch the Installation

The full project, from planning to the finished cranes (1:41). A written transcript is at the bottom of this post.

The Project: Lifting Steel Grates to a Future Conveyor Line

The customer’s goal was simple: pick up heavy steel grates and move them onto a conveyor that is planned for their production line. That meant three jib cranes working in the same part of the plant, each one positioned where operators will load the conveyor.

The conveyor was not installed yet when we filmed. The cranes are in place now so that, once the conveyor goes in, operators can lift grates with a hoist instead of moving them by hand. The goal is less manual handling and a more efficient step in their production process, the kind of improvement we help with across industrial manufacturing operations.

Why Did Placement Matter With Three Cranes in One Area?

Short answer: each crane needed the reach to do its job without its boom or load swinging into another crane, existing equipment or a walkway.

Before any work started, we worked with the customer to decide exactly where each crane needed to go. With three jib cranes in the same area, we looked at:

  • Reach: whether each boom could cover the pickup point and the planned conveyor location.
  • Interference: whether booms and loads could swing into each other or into nearby equipment.
  • Collision points: building columns, racks, work stations and traffic paths around each crane.
  • The future layout: where the conveyor will sit once it is installed.

This is the part of a jib crane project that is easy to underestimate. A crane that can lift the weight is only useful if it fits the space and works with everything around it.

What Is a Foundationless Jib Crane?

Short answer: a foundationless jib crane is a floor-mounted, freestanding jib crane that bolts directly to an existing concrete slab, without the separate poured foundation a traditional freestanding jib crane often needs.

A freestanding (floor-mounted) jib crane has a vertical mast, a horizontal boom that rotates, and a hoist that runs along the boom. Because the mast stands on its own, the load has to be carried by whatever the mast is anchored to.

With a traditional freestanding jib crane, you may need to cut into the existing concrete and pour a new foundation under the mast. That adds time and work to the installation. A foundationless design uses a wide base plate and anchor bolts to carry the load into the existing floor, so as long as that floor meets the manufacturer’s requirements, no separate foundation is needed.

Diagram comparing a traditional freestanding jib crane on a new poured foundation with a foundationless jib crane bolted to the existing concrete slab
Simplified illustration, not to scale. Actual base plates, anchors and slab requirements vary by crane model and manufacturer.

Do You Need a New Foundation for a Freestanding Jib Crane?

Short answer: not always. If your existing concrete slab meets the crane manufacturer’s requirements, a foundationless jib crane can anchor directly to it. If it does not, or if you need a heavier capacity or longer reach than a foundationless model allows, a poured foundation may still be required.

Every manufacturer publishes its own requirements, and they depend on the crane’s capacity and span. They typically cover things like:

  • Minimum slab thickness
  • Minimum concrete strength
  • The condition of the floor where the base will sit (cracks, damage, previous repairs)
  • Distance from slab edges and joints
  • The specific anchors and installation method

If you are not sure what your floor is made of, that is the first thing to find out, and we can help you work through it. Always follow the manufacturer’s installation instructions, and bring in a qualified engineer when the slab’s makeup is unknown.

How Did the Installation Go?

Short answer: once the planning was done and the locations were finalized, our installation team installed all three cranes in about a day. The work followed the same order for each crane:

  1. Mark the locations agreed on during planning.
  2. Drill the anchor holes in the existing concrete floor.
  3. Set the base and anchors and secure the base plate to the slab.
  4. Stand the mast with a forklift and a scissor lift.
  5. Attach the boom and hoist, then check the finished crane.
Installation crew drilling anchor holes in an existing concrete floor for a foundationless jib crane
Drilling anchor holes in the existing slab. No cutting or pouring.
Foundationless jib crane base plate anchored to the existing concrete slab with anchor bolts
The base plate and anchor bolts carry the load into the existing floor.
Crew lifting a jib crane boom onto the mast with a forklift and scissor lift
Setting a boom on its mast with a forklift and a scissor lift.

Foundationless vs. Traditional Freestanding Jib Cranes

FactorFoundationless Jib CraneTraditional Freestanding Jib Crane
Foundation workNone. Anchors to the existing slabOften requires cutting the slab and pouring a new foundation
Floor requirementExisting slab must meet the manufacturer’s requirementsThe new foundation is designed for the crane
Installation timeShorter. On this project: three cranes in about a dayLonger, because of the excavation and foundation work
Capacity and reachGenerally suited to lighter capacities and shorter spansCan support heavier capacities and longer spans
Best fitFacilities with a suitable slab that want a faster, simpler installHeavier lifts, longer reach, or floors that do not qualify

When Is a Foundationless Jib Crane Not the Right Fit?

Foundationless jib cranes are a great option when the floor and the application suit them, but they are not the answer for every project. A different approach may be the better call when:

  • Your slab does not meet the manufacturer’s thickness, strength or condition requirements.
  • You need a heavier capacity or a longer span than foundationless models offer.
  • The best crane location is too close to a slab edge, joint or damaged area.
  • The work area would be better served by a wall-mounted, column-mounted, bridge or gantry crane. Our guide to ceiling-mounted bridge cranes vs. gantry cranes covers some of those options.
Finished jib crane with electric hoist above stacks of steel grating
A finished crane above stacks of steel grating, ready for the planned conveyor.

What This Project Shows

This is a good example of why we like to work directly with our customers to understand what they are trying to accomplish. It is not always just about finding a crane that can lift a certain amount of weight. It is also about making sure it fits the space, has the reach they need, and works with the rest of their equipment.

Frequently Asked Questions

What is a foundationless jib crane?

A foundationless jib crane is a floor-mounted, freestanding jib crane that bolts directly to an existing concrete slab using a wide base plate and anchors, instead of sitting on a separate poured foundation. It can only be used when the slab meets the crane manufacturer’s requirements.

Do freestanding jib cranes always need a foundation?

No. Traditional freestanding jib cranes often need a new poured foundation, but a foundationless model can anchor to an existing slab that meets the manufacturer’s requirements. Heavier capacities, longer spans or floors that do not qualify may still need a foundation.

How long does it take to install a foundationless jib crane?

It depends on the number of cranes, the site and the crane size. On this project, once the locations were planned and finalized, our installation team installed three foundationless jib cranes in about a day.

How do I know if my concrete floor can support a foundationless jib crane?

Compare your slab to the manufacturer’s published requirements, which typically include minimum thickness, concrete strength, floor condition and distance from edges and joints. If you do not know your slab’s makeup, have it checked before you buy. We can help you through that process.

What is the difference between a freestanding and a floor mounted jib crane?

They are generally the same thing: a jib crane whose mast stands on the floor on its own, rather than mounting to a wall or building column. Foundationless jib cranes are one type of freestanding, floor-mounted jib crane.

Why does crane placement matter when installing several jib cranes?

Each crane needs enough reach to cover its work area without its boom or load swinging into another crane, nearby equipment, columns or walkways. Planning placement up front avoids collision points and makes sure the cranes work with the rest of the layout.

Planning a Jib Crane Project?

Whether you need a single jib crane or a lifting solution for an entire production line, B&C Industrial Products can help you figure out what works best for your operation. Browse our jib cranes, request a quote, or call us at (888) 276-3386.

Video transcript

We recently installed three foundationless jib cranes for a customer that manufactures industrial steel grating. They needed a way to lift heavy steel grates and move them over to a conveyor system that will be installed along their production line.

Before we started, we worked with the customer to figure out exactly where each crane needed to go. With three cranes in the same area, placement mattered. Each one needed the reach to do its job, without interfering with other equipment or creating collision points.

One of the nice things about this project was that we could use foundationless jib cranes. With a traditional freestanding jib crane, you may need to cut into the existing concrete and pour a new foundation. That adds time and work to the install. Foundationless jib cranes are different. As long as the existing concrete meets the manufacturer’s requirements, they anchor directly to the floor. No separate foundation needed. That made the installation a lot simpler.

Once the locations were finalized, our installation team was able to install all three cranes in about a day. Once the conveyor is in, the customer will use these cranes to pick up steel grates and set them on the conveyor, cutting down on manual handling and making that part of their production more efficient.

This is a good example of why we like to work directly with our customers. It’s not just about finding a crane that can lift a certain weight. It’s about making sure it fits the space, has the reach they need, and works with the rest of their equipment. Whether you need a single jib crane or a solution for an entire production line, B&C Industrial Products can help you figure out what works best for your operation.

Keep reading